Construction of the office walls began today. These walls are being constructed at an off sight location in six sections (front, back, and two smaller sections for each side). The three of us who worked today were able to complete four out of six sections and plan to finish the remaining two sections Monday evening. Each section has been boarded in and framed for windows and doors.

We need six guys for an hour on Friday evening to load these wall sections on a trailer for transportation on Saturday to the construction sight.